3154 Investsud
Location : Marche-en-Famenne, Belgium
Surface : 1.800 m²
Client : Investsud
Year : 2007
Satus : Completed
Surface : 1.800 m²
Client : Investsud
Year : 2007
Satus : Completed
Sustainable and passive offices. This project’s ambition is to reach the passive standard of a consumption of 15 kW/m²/year without sacrificing comfort. This residual consumption will be compensated throughout the years in solar energy to reach 0 kW/m²/year. The building uses low footprint materials and a balanced work environment – it is the first office building with a mixed concrete-wood structure. The insulating façade materials – wood-fiber based, act gradually as vapor barrier.
Publications:
Bepassive
Vers l’avenir Luxembourg 2008
La chronique
La libre Belgique
Carrément captivant – Entreprendre
A+ 2008
Territoires et bois
Confluent
Le Soir
Paper jam
Architectures les nouveaux talents - Racine 2011
Bepassive
Vers l’avenir Luxembourg 2008
La chronique
La libre Belgique
Carrément captivant – Entreprendre
A+ 2008
Territoires et bois
Confluent
Le Soir
Paper jam
Architectures les nouveaux talents - Racine 2011
Photos by Laurent Brandajs